If the property owner provides a location for installing charging stations and a connection point with the required power capacity in a transformer substation owned by the property owner, a land lease agreement is concluded. The rent is set at 20% of the total cost of consumed electricity.
- The tenant, at their own expense and with the assistance of the landlord, prepares the necessary permits, installs, and commissions the equipment.
- The tenant makes a 100% prepayment for electricity based on the consumption calculation agreed upon with the energy supply company.
- The tenant reimburses 100% of the consumed electricity costs on a monthly basis.
- The tenant pays a monthly rent equal to 20% of the consumed electricity.
- The tenant participates in the maintenance of the transformer substation (TS) and other expenses related to the uninterrupted operation of the charging stations, according to the electricity consumption.
| Number of charging stations [units] | Average monthly electricity consumption [kW] | Electricity price per kW including additional costs [UZS] | Monthly electricity cost [UZS] | Substation on the Partner's side – Rent payment 20% [UZS] |
|---|---|---|---|---|
| 1 | 25 000 | 1 000 | 25 000 000 | 5 000 000 |
| 2 | 50 000 | 1 000 | 50 000 000 | 10 000 000 |
| 3 | 75 000 | 1 000 | 75 000 000 | 15 000 000 |
| 4 | 100 000 | 1 000 | 100 000 000 | 20 000 000 |
| 5 | 125 000 | 1 000 | 125 000 000 | 25 000 000 |
| 10 | 250 000 | 1 000 | 250 000 000 | 50 000 000 |
OPTION № 2

Learn More
If the property owner provides a location for installing charging stations and a connection point with the required power capacity in the transformer substation (TS), under the condition that the transformer is replaced at the expense of the tenant, LLC “E-ONE”, a land lease agreement is concluded. The rent is set at 10% of the total cost of consumed electricity. The replaced transformer becomes the property of LLC “E-ONE”, while the newly installed transformer becomes the property of the landlord.
- The tenant, at their own expense and with the assistance of the landlord, prepares the necessary permits, installs, and commissions the equipment.
- The tenant makes a 100% prepayment for electricity based on the consumption calculation agreed upon with the energy supply company.
- The tenant reimburses 100% of the consumed electricity costs on a monthly basis.
- The tenant pays a monthly rent equal to 10% of the consumed electricity.
- The tenant participates in the maintenance of the transformer substation (TS) and covers other expenses related to the uninterrupted operation of the charging stations, in proportion to the electricity consumed.
| Number of charging stations [units] | Average monthly electricity consumption [kW] | Electricity price per kW including additional costs [UZS] | Monthly electricity cost [UZS] | Substation on the Partner's side – Rent payment 10% [UZS] |
|---|---|---|---|---|
| 1 | 25 000 | 1 000 | 25 000 000 | 2 500 000 |
| 2 | 50 000 | 1 000 | 50 000 000 | 5 000 000 |
| 3 | 75 000 | 1 000 | 75 000 000 | 7 500 000 |
| 4 | 100 000 | 1 000 | 100 000 000 | 10 000 000 |
| 5 | 125 000 | 1 000 | 125 000 000 | 12 500 000 |
| 10 | 250 000 | 1 000 | 250 000 000 | 25 000 000 |
OPTION № 3

Learn More
If the property owner decides to purchase charging stations for ownership, subsequent operation, and revenue generation, two agreements are concluded:
- Sales Agreement, Leasing Agreement, or Loan Agreement – for the acquisition of charging stations.
- Service Agreement – under which the executor, LLC “E-ONE”, receives 5% of the revenue from the electricity sold to consumers for support and software services.
- The property owner, at their own expense and with the full assistance of LLC “E-ONE”, prepares the necessary permits and installs the equipment, while LLC “E-ONE” carries out commissioning and setup of the equipment.
- LLC “E-ONE”, upon mutual agreement, may independently handle all work related to obtaining permits, installation, and commissioning of the equipment. The cost of these services must be agreed upon and included in the purchase agreement for the charging stations.
- LLC “E-ONE” connects the charging stations to a unified software system and ensures uninterrupted technical support.
- The equipment owner ensures the uninterrupted operation of the transformer substation (TS) at their own expense.
| Number of charging stations [units] | Average monthly electricity consumption [kW] | Electricity price per kW including additional costs [UZS] | Monthly electricity cost [UZS] | Electricity selling price per kW [UZS] | Monthly electricity sales revenue [UZS] | E-One mobile app support contract cost 5% [UZS] | Monthly gross income [UZS] |
|---|---|---|---|---|---|---|---|
| 1 | 25 000 | 1 000 | 25 000 000 | 2 500 | 62 500 000 | 3 125 000 | 34 375 000 |
| 2 | 50 000 | 1 000 | 50 000 000 | 2 500 | 125 000 000 | 6 250 000 | 68 750 000 |
| 3 | 75 000 | 1 000 | 75 000 000 | 2 500 | 187 500 000 | 9 375 000 | 103 125 000 |
| 4 | 100 000 | 1 000 | 100 000 000 | 2 500 | 250 000 000 | 12 500 000 | 137 500 000 |
| 5 | 125 000 | 1 000 | 125 000 000 | 2 500 | 312 500 000 | 15 625 000 | 171 875 000 |